Amethyst East and Amethyst West (BP)
Offshore gas field in production.
Block and licence number: 47/14a, P.005
Map reference: Plate 10
Licensees and company interest in block (%) at end of 1997:
Britoil plc 32.00
Enterprise Oil plc 32.00
ARCO British Ltd 20.00
Murphy Petroleum Ltd 12.00
Fina Petroleum Development Ltd 4.00
Date of discovery:
Amethyst East:
Amethyst West:

October 1972
April 1970
Production start:
Amethyst East:
Amethyst West:

September 1990
July 1992
Operator’s estimate of:
Recoverable reserves originally present: Gas: 20.84 (billion cubic metres)
NGLs: 0.86 (million tonnes)
First year of peak production: 1992
Peak production Gas (billion cubic metres per year): 1.50
Water depth: 21m
Transport system: Pipeline to Easington.
Extension into other UK blocks: Block number, licence number and licensee/company interest in block (%) at end of 1997:

47/8a, 47/9a, P.030

BG North Sea Holdings Ltd 30.77
B G Expl. & Prod. Ltd 30.77
Amerada Hess Ltd 23.08
B G Expl. Operating Co. Ltd 15.38

47/15a, P.133

BG plc 50.00
BG North Sea Holdings Ltd 22.22
Amerada Hess Ltd 16.67
B G Expl. Operating Co. Ltd 11.11

47/13a, P.050

ARCO British Ltd 50.00
Britoil plc 50.00
Remarks: Four platforms not normally manned.
Name Amethyst: A precious stone, reflecting value.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12