| Chanter | (Elf Exploration UK) |
| Offshore oil field in production. | |
![]() |
|
| Block and licence number: | 15/17, P.250 |
| Map reference: | Plate 8 |
| Licensees and company interest in block (%) at end of 1997: | |
| Elf Exploration UK PLC | 24.33 |
| Texaco Britain Ltd | 23.50 |
| LASMO(TNS) Ltd | 20.00 |
| Union Texas Petroleum Ltd | 20.00 |
| Enterprise Oil Production Ltd | 12.17 |
| Date of discovery: | September 1985 |
| Production start: | April 1993 |
| Operators estimate of: | |
| Recoverable reserves originally present (million tonnes): | Oil: 0.56 Condensate: 0.21 NGLs: 0.10 Gas: (billion cubic metres) 0.40 |
| First year of peak production: | Oil: 1993 Gas: 1995 |
| Peak production (million tonnes per year): | Oil: 0.20 Condensate: 0.20 Gas: (billion cubic metres) 0.24 |
| Water depth: | 142m |
| Gravity: | 37.8º API |
| Sulphur content: | 0.30% |
| Transport system: | Oil and gas condensate liquids piped via Piper B to Flotta. Fuel gas exported to Claymore A when required balance via MCPOI and Frigg line to St. Fergus. |
| Extension into other UK blocks: | None |
| Remarks: | |
| Name Chanter | A chanter is the part of a set of bagpipes on which the melody is played. |
Title
| Table of Contents
Chapter 1
| Chapter 2
| Chapter 3
| Chapter 4 |
Chapter 5 |
Chapter 6
| Chapter 7
| Chapter 8
| Chapter 9
Appendix 1
| Appendix 2
| Appendix 3
| Appendix 4
| Appendix 5
| Appendix 6
| Appendix 7
| Appendix 8
Appendix 9
| Appendix 10
| Appendix 11
| Appendix 12
| Appendix 13
| Appendix 14
| Appendix 15
| Appendix 16
| Appendix 17
Plate 1
| Plate 2W
| Plate 2E
| Plate 3W
| Plate 3E
| Plate 4W
| Plate 4E
| Plate 5W
| Plate 5E
| Plate 6
| Plate 7
Plate 8W
| Plate 8E
| Plate 9W
| Plate 9E
| Plate 10W
| Plate 10E
| Plate 11
| Plate 12