Elgin (Elf Exploration UK)
Offshore gas and condensate field under development.
Block and licence number: 22/30b, P.188
Map reference: Plate 9
Licensees and company interest in block (%) at end of 1997:
Elf Exploration UK Plc 46.173
AGIP (UK) 13.867
BG Exploration & Production Ltd 12.350
Hardy Expl. & Production Ltd 8.000
Ruhrgas UK Expl. & Prod. Ltd 5.200
Shell UK Ltd 4.375
Esso Expl. and Prod. UK Ltd 4.375
Texaco Britain Ltd 3.900
ARCO Britain Ltd 1.760
Date of discovery: March 1991
Production start: (Expected) April 2000
Operator’s estimate of:  
Recoverable reserves originally present (million tonnes): Condensate: 30.66
NGLs: 3.53
(billion cubic metres): Gas: 27.54
First year of peak production:  
Peak production (million tonnes per year):  
Water depth: 93m
Gravity: 0.806º API
Sulphur content: less than 0.1%
Transport system: Condensate will be exported by a 24" x 24 mile spur line to BP’s Marnoch platform from which it will be piped ashore through BP’s Forties pipeline system to Kinneil and gas will be exported through a 34" x 292 mile new gas pipeline to Bacton.
Extension into other UK blocks: Block number, licence number and licensee/company interest in block (%) at end of 1997:

22/30c, P.666 and 29/5b, P.362

Companies as above

Remarks:  
Name Elgin As a tribute to Nigel, one of the geologists who was instrumental in the field’s discovery, Elgin being an anagram of his name.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12