Hatfield Moors (Edinburgh Oil & Gas)
Onshore gas field in production.
Block and licence number: L46/11, PL.161 & PL.162
Map reference: Plate 12
Licensees and company interest in block (%) at end of 1997:
Edinburgh Oil & Gas plc 100.00
Date of discovery: December 1981
Production start: January 1986
Operator’s estimate of:  
Recoverable reserves originally present (billion cubic metres): 0.14
First year of peak production: 1986
Peak production (billion cubic metres per year): 0.014
Transport system: 1) Pipeline to Belton Brickworks.
2) Pipeline connection with British Gas regional transmission network for sales to Scottish Power (commenced November 1994).
Extension into other UK blocks: None
Remarks:  
Name Hatfield Moors The field is close to Hatfield Moors, a large flat area to the east of Doncaster, adjacent to the Isle of Axholme on the South Yorkshire and Lincolnshire border.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12