Heather (DNO Heather)
Offshore oil field in production.
Block and licence number: 2/5, P.242
Map reference: Plate 6
Licensees and company interest in block (%) at end of 1997:
DNO Heather Ltd 31.25
BG Great Britain Limited 31.25
Texaco Exploration Limited 31.25
DNO (Heather Oilfield) Ltd 6.25
Date of discovery: December 1973
Production start: October 1978
Operator’s estimate of:  
Recoverable reserves originally present (million tonnes): 14.20
First year of peak production: 1982
Peak production (million tonnes per year): 1.70
Water depth: 145m
Gravity: 32/37º API
Sulphur content: 0.70%
Transport system: Oil and NGLs piped to Sullom Voe via Ninian Central platform.
Extension into other UK blocks: None
Remarks: Approval was given in 1985 to connect platform to the Western Leg of FLAGS via a 6" pipeline for the import of fuel gas. Operatorship was transferred from Unocal Britain Ltd to DNO Heather Ltd with effect from 1st January 1997.
Name Heather Named after the plant which grows on Scottish moors.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12