Judy (Phillips)
Offshore condensate field in production.
Block and licence number: 30/7a, P.032
Map reference: Plate 9
Licensees and company interest in block (%) at end of 1997:
Phillips Petroleum Co. UK Ltd. 36.50
AGIP (UK) Ltd. 33.00
BG Expl. & Prod. Ltd. 30.50
Date of discovery: August 1985
Production start: October 1995
Operator’s estimate of:  
Recoverable reserves originally present (billion cubic metres): 5.26
(million tonnes): 5.03
First year of peak production: 1999
Peak production (billion cubic metres per year) (million tonnes per year): 0.79
(million tonnes per year): 0.77
Water depth: 75m
Gravity: 39º API
Sulphur content:  
Transport system: Gas by pipeline into the CATS system. Liquids by pipeline into Norpipe oil pipeline to Teesside, England.
Extension into other UK blocks: Block number, licence number and licensee/company interest in block (%) at end of 1997:

30/12a, P.032

Phillips Petroleum Co. UK Ltd. 36.50
AGIP (UK) Ltd 33.00
BG Expl. & Prod. Ltd. 30.50
Remarks: Manned platform used to develop Judy and Joanne fields.
Name Judy Phillips assigned the letter ‘J’ to this licence. All leads and prospects in this area are given names starting with this letter.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12