| Miller | (BP) | ||||||||
| Offshore oil field in production. | |||||||||
![]() |
|||||||||
| Block and licence number: | 16/7b, P.340 | ||||||||
| Map reference: | Plate 8 | ||||||||
| Licensees and company interest in block (%) at end of 1997: | |||||||||
| Britoil (Beta) Ltd | 100.00 | ||||||||
| Date of discovery: | March 1983 | ||||||||
| Production start: | June 1992 | ||||||||
| Operators estimate of: | |||||||||
| Recoverable reserves originally present (million tonnes): | 41.11 (billion cubic metres): Gas 11.70 |
||||||||
| First year of peak production: | 1993 | ||||||||
| Peak production (million tonnes per year): | 5.90 | ||||||||
| Water depth: | 102.4m | ||||||||
| Gravity: | 39°API | ||||||||
| Sulphur content: | 0.40% | ||||||||
| Transport system: | Oil and NGLs piped to Cruden Bay via Forties system. Rich gas transported through a new line to St. Fergus and on to Boddom Power Station. | ||||||||
| Extension into other UK blocks: | Block
number, licence number and licensee/company interest in
block (%) at end of 1997: 16/8b, P.341
|
||||||||
| Remarks: | Production via a fixed manned steel platform. | ||||||||
| Name Miller | After Hugh Miller (1802-1856) the Scottish geologist and man of letters. | ||||||||
Title
| Table of Contents
Chapter 1
| Chapter 2
| Chapter 3
| Chapter 4 |
Chapter 5 |
Chapter 6
| Chapter 7
| Chapter 8
| Chapter 9
Appendix 1
| Appendix 2
| Appendix 3
| Appendix 4
| Appendix 5
| Appendix 6
| Appendix 7
| Appendix 8
Appendix 9
| Appendix 10
| Appendix 11
| Appendix 12
| Appendix 13
| Appendix 14
| Appendix 15
| Appendix 16
| Appendix 17
Plate 1
| Plate 2W
| Plate 2E
| Plate 3W
| Plate 3E
| Plate 4W
| Plate 4E
| Plate 5W
| Plate 5E
| Plate 6
| Plate 7
Plate 8W
| Plate 8E
| Plate 9W
| Plate 9E
| Plate 10W
| Plate 10E
| Plate 11
| Plate 12