Nevis (Mobil)
Offshore oil & gas field in production.
Block and licence number: 9/13a, P.139
Map reference: Plate 7
Licensees and company interest in block (%) at end of 1997:
Mobil North Sea Ltd 45.00
Amerada Hess Ltd 20.00
Enterprise Oil plc 20.00
BG North Sea Holdings Ltd 10.00
OMV (UK) Ltd 5.00
Date of discovery: August 1974
Production start: September 1996
Operator’s estimate of:  
Recoverable reserves originally present (million tonnes): 11.68
First year of peak production: 1999
Peak production (million tonnes per year): 1.152
Water depth: 104m
Gravity: 36° API
Sulphur content: Nil
Transport system: Tanker loading offshore from Beryl facilities for oil, gas through the SAGE system.
Extension into other UK blocks: Block number, licence number and licensee/company interest in block (%) at end of 1997:

9/12a, P. 254

Amerada Hess Ltd 27.78
Mobil North Sea Ltd 34.55
Amerada Hess (Oil & Gas) Ltd 37.67
Remarks: Nevis South is Stage 1 of the Nevis Field development. Nevis South will be a phased subsea development routed to the Beryl A platform for the processing and export of hydrocarbons.
Name Nevis Mobil operated North Sea fields are named after Scottish lochs and firths.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12