Tiffany (AGIP)
Offshore oil field in production.
Block and licence number: 16/17, P.225
Map reference: Plate 8
Licensees and company interest in block (%) at end of 1997:
AGIP (UK) Ltd 47.48
Fina Exploration Ltd. 30.00
LL & E (UK) Inc. 11.26
Murphy Petroleum Ltd. 11.26
Date of discovery: July 1977
Production start: November 1993
Operator’s estimate of:  
Recoverable reserves originally present (million tonnes): 12.20
First year of peak production: 1995
Peak production (million tonnes per year): 1.94
Water depth: 125.1m
Gravity: 33.6°API
Sulphur content: 0.6%
Transport system: Oil piped via Brae/Forties system to Cruden Bay. Gas exported to Marathon’s Brae complex.
Extension into other UK blocks: None
Remarks:  
Name Tiffany Phillips, the original operator, assigned the letter ‘T’ to this particular licence. All leads and prospects in this area were given female names starting with this letter.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12