Trent (ARCO)
Offshore gas field in production.
Block and licence number: 43/24, P. 685
Map reference: Plate 10
Licensees and company interest in block (%) at end of 1997:
ARCO British Ltd 61.25
Talisman North Sea Ltd 20.00
Atlantic Richfield Oil & Gas (St James) Ltd 18.75
Date of discovery: March 1991
Production start: November 1996
Operator’s estimate of:  
Recoverable reserves originally present (billion cubic metres): (Total): 3.80
Phase 1: 2.60
First year of peak production: 1996
Peak production (billion cubic metres per year): 0.48
Water depth: 48m
Transport system: Via Eagles pipeline (previously referred to as ETS) into Bacton.
Extension into other UK blocks: None
Remarks:  
Name Trent A river in the English Midlands.

Title | Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4 | Chapter 5 | Chapter 6 | Chapter 7 | Chapter 8 | Chapter 9
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8
Appendix 9 | Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5W | Plate 5E | Plate 6 | Plate 7
Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12