APPENDIX 15 Decommissioned Installations*
|
Field/Installation |
Operator at time of Approval |
Operator following licence/company change |
Main Installations Decommissioned |
Approved Decommissioning Option |
Year of Approval |
|
Piper Alpha |
Occidental |
Talisman |
Fixed Steel Platform |
Toppling |
1988 |
|
Crawford |
Hamilton |
BHP |
Floating Production, Facility (FPF) |
Removal to shore |
1991 |
|
Catenary Anchor Leg Mooring (CALM) Buoy |
Removal to shore |
||||
|
Subsea Facilities |
Removal to shore |
||||
|
Argyll, Duncan and Innes |
Hamilton |
BHP |
Floating Production, Facility (FPF) |
Removal to shore |
1992 |
|
Catenary Anchor Leg Mooring (CALM) Buoy |
Removal to shore |
||||
|
Blair |
Sun Oil |
AGIP |
Subsea |
Re-use |
1992 |
|
Angus |
Amerada Hess |
Floating Production, Storage and Offloading (FPSO) Vessel |
Re-use |
1993 |
|
|
Forbes AW |
Hamilton |
BHP |
Fixed Steel Platform |
Removal to shore |
1993 |
|
Esmond CP & CW |
BHP |
2 x Fixed Steel Platform |
Removal to shore |
1995 |
|
|
Gordon BW |
BHP |
Fixed Steel Platform |
Removal to shore |
1995 |
|
|
Emerald |
MSR |
FPSO |
Re-use |
1996 |
|
|
Frigg FP |
Elf Norge |
TotalFinaElf Norge |
Flare Column |
Removal to shore |
1996 |
|
Leman BK |
Shell |
Fixed Steel Platform |
Removal to shore |
1996 |
|
|
Staffa |
Lasmo |
Subsea |
Removal to shore |
1996 |
|
|
Viking AC, AD, AP & FD |
Conoco |
4 x Fixed Steel Platform |
Removal to shore |
1996 |
|
|
Brent Spar |
Shell |
Oil Storage and Loading Facility |
Re-use as part of quay extension |
1998 |
|
|
Donan |
BP |
FPSO |
Re-use |
1998 |
|
|
Fulmar SALM |
Shell |
Single Anchor Leg Mooring Buoy |
Removal to shore |
1998 |
|
|
Blenheim and Bladon |
Talisman |
FPSO |
Re-use |
2000 |
|
|
Durward and Dauntless |
Amerada Hess |
FPSO |
Re-use |
2000 |
|
|
Subsea Facilities |
Removal to shore |
||||
|
Maureen and Moira |
Phillips |
Large Steel Gravity Platform |
Re-use or Removal to shore |
2000 |
|
|
Concrete Loading Column |
Re-use or Removal to shore |
||||
|
Camelot CB |
Mobil |
Fixed Steel Platform |
Re-use or Removal to shore |
2001 |
* For which an approved decommissioning programme exists under the Petroleum Act 1998.
Back
| Title
| Table of Contents
Chapter 1 | Chapter 2 | Chapter 3 | Chapter 4
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix
5 | Appendix 6 | Appendix 7 | Appendix 8 | Appendix 9
Appendix 10 | Appendix 11 | Appendix 12 |
Appendix 13 | Appendix 14 | Appendix 15 |
Appendix 16 | Appendix
17
Index Map | Plate 1 |
Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate
4W | Plate 4E | Plate 5W | Plate 5E | Plate 6
Plate 7 | Plate
8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate
10E | Plate 11 | Plate 12 | Legend
Legal Notice
Please send comments to: DTI-
Julian Wells - Data by Design Ltd